Our team are undertaking a Drainage Impact Assessment to support a proposed Storage Lockup development in Fife. To inform this, our engineers are undertaking a series of Trial Pit investigations and soakaway tests in accordance with BRE 365 Methodology to design an infiltration-based SuDs system.
The site currently drains to the Combined Sewer therefore we are playing our role in reducing surface water inputs to the public sewerage system to the betterment of all!