• Home
  • Company
    • About Us
    • Projects
    • Meet The Team
    • Testimonials
    • LinkedIn
    • Company Policies
  • Services
    • Flood Risk Assessments
    • Environmental Impact Assessments
    • Onshore Renewables Infrastructure Design
    • SuDS & Surface Water Drainage
    • Wastewater Treatment & Drainage
    • Water Quality Monitoring
    • ALL SERVICES
  • Sectors
    • Industrial, Retail & Manufacturing
    • Infrastructure
    • Mining & Minerals
    • Onshore Renewables & Storage
    • Property & Urban Regeneration
    • Rural Tourism & Recreation
    • Waste Management
  • Careers
  • Contact Us

Fairfield Works, Rattray – Surface Water Drainage Design for Storage Yard Redevelopment

Gondolin Land & Water was appointed to deliver a robust Surface Water

Flood Risk and Surface Water Management at Bandeath Industrial Estate

Gondolin Land & Water's proposed drainage layout.Gondolin Land and Water was appointed

Delivering Sustainable Surface Water Management for the Alvance Billet Plant, Fort William

Gondolin Land and Water was pleased to support Alvance Aluminium Group in

Sustainable Engineering for Nature: Our Work with RSPB Across Scotland

Taken by a member of the Gondolin team whilst investigating an RSPB

Gondolin Returns to Polbeth Community Woods and Garden

Last week, the Gondolin team took part in a team volunteering day

Poppleton Solar Farm – Flood Risk Assessment

Poppleton Solar Farm – currently arable land, soon to support clean energy

Flood Risk and Drainage Assessment for Mixed-Use Redevelopment in Dundee

Visualisation of the redevelopment premises in Dundee City Centre, provided by kennedytwaddle.Gondolin

Kilgallioch Wind Farm Extension – Drainage Strategy & Water Management Plan

Gondolin Land and Water was appointed by ITPEnergised on behalf of ScottishPower

Berwick Bank Offshore Wind Farm – Onshore Infrastructure Design

Gondolin’s Role in the Berwick Bank Offshore Wind Farm ProjectIn late 2023,

Gondolin Land & Water – Three Years in Business

Providing Civil Engineering and Environmental Services for Three YearsGondolin Land & Water

Gondolin Volunteers: Enhancing Drainage Design in West Calder Community Garden

Recently, the entire Gondolin team dedicated a workday to volunteering at the

Gondolin Supports Whitekirk Hill with Innovative Nature-Based Wastewater Treatment System

Since last summer, Gondolin has been collaborating with the fantastic team at

Sustainable Drainage Systems in Renewable Energy: Keadby BESS Project Success

Gondolin were delighted to hear that planning approval was granted for the

Submission of Our Hydro Power Scheme on the Isle of Arran

In collaboration with APT PLANNING & DEVELOPMENT LIMITED, Gondolin Land & Water has

Wastewater Drainage Solution: Planning Permission Success for Hawkswood Country Estate

Gondolin have been working on a private wastewater drainage solution with Hawkswood

Drainage Design Scotland: Upgrading an Anaerobic Digestion Plant’s Drainage Systems

Gondolin Land & Water are excited to be working in collaboration with

Engineering Support for Battery Energy Storage Sites and Quarry Management

Site Visits to Battery Energy Storage Sites in EnglandRecent work has taken

Nature Based Wastewater Treatment – Planning Permission Granted

Planning permission has been granted to a proposed development which involves an

Meet Gondolin’s New Technical Director

Meet Gondolin's new Technical Director, Richard Lucey. We are thrilled to welcome

Site Investigation & SuDS Design in East Lothian, Scotland

Our team recently completed a site investigation at the Whitekirk Hill Luxury

Our Role in the £30 Million Development: Flood Risk Assessment and Drainage Design

Gondolin Land & Water are proud to contribute our specialist expertise in

Gondolin Is Proud to be A Living Wage Employer

The Gondolin team supporting a local community woodland charity.Gondolin Land & Water

Gondolin Land & Water Joins Scottish Renewables for 2022-2023

Exciting News! Gondolin Land & Water is now a Member of Scottish

Gondolin

News

About

The Team

Privacy Policy

Contact

Services

Sectors

Careers

Contact

26 Leith Walk, Edinburgh, Leith, EH6 5AA

T: +44 (0)131 305 1298 

M: +44 (0)7454 112758

enquiries@gondolinltd.co.uk

Social

affiliations

Copyright 2025 Gondolin Land and Water, all rights reserved.

>
Manage Cookie Consent
To provide the best experience, we use cookies. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}